Reconstruction of the wind farm

Reconstruction Windfarm Chukotka

Implementation of the first stage of reconstruction of the existing Windfarm Chukotka №1 with the replacement of three broken-down existing wind turbines in the complete overhaul of wind turbines Vestas. The installed electric capacity of the new wind generators is 750 kW (3 x 250 kW).

Scope of works:

- Technology project design

- Project design

- Installation

- Equipment delivery

- Installation supervision

- Commissioning works