Reconstruction Windfarm Chukotka
Implementation of the first stage of reconstruction of the existing Windfarm Chukotka №1 with the replacement of three broken-down existing wind turbines in the complete overhaul of wind turbines Vestas. The installed electric capacity of the new wind generators is 750 kW (3 x 250 kW).
Scope of works:
- Technology project design
- Project design
- Installation
- Equipment delivery
- Installation supervision
- Commissioning works