Design, construction and operation of a gas piston power Anadyr, Chukotka Autonomous Area, Russia - electrical capacity of 28.4 MW and a thermal capacity of 85.4 MW.
Scope of works:
- Project design
- Equipment delivery
- Installation supervision
- Construction and installation
- Comissioning works