Delivery of main equioment of energy center based of 2 piston gas engine units AoE 16V4000L62 produced by MTU Onsite Energy GmbH with exhaust gas steam boiler Viessmann (Total electrical output 3.0 MW, total heat output 3.2 MW).
Scope of works:
- Equipment delivery
- Installation supervision
- Comissioning works