"Turnkey" steam boiler plant based on 2 boilers 8 t / h of steam each produced by BBS GmbH, and 1 gas piston unit 8V4000L62 with nominal electrical output 772 kW produced by MTU Onsite Energy GmbH with exhaust gas steam heat recovery system.
Scope of works:
- Project design
- Equipment delivery
- Installation supervision
- Construction and installation
- Comissioning works